A warehouse can pack faster than it can dispatch. Convert three rates into one unit, choose an investment, and defend it when another member of the group challenges your assumptions.

Calculate the capacity of the whole line

Give each person in your group one figure from this original FBO case. Orders are picked at 4 per minute, packed at 150 per hour and dispatched at 2 per minute. Demand is 180 orders per hour. Work in orders per hour. Picking can handle 240, packing 150 and dispatch 120. With no opening backlog, breaks or downtime, 120 orders can leave the line in an hour.

Cross out the improvement that buys no throughput

An extra picker raises picking to 300 per hour. A driver raises dispatch to 180. Under the assumptions above, the extra picker delivers no additional completed orders. The driver lifts output to 150 per hour, where packing becomes the limit. An eight-hour shift at steady state could therefore deliver 240 extra orders. Label that as capacity before quoting it as a sales benefit.

Hand the recommendation to someone else

Say, “I would run the dispatch trial first. Can someone test this against the packing data?” Ask a teammate to introduce a constraint such as a second shift starting late. Recalculate the affected hours only. Close with the measure the group would watch together. Track dispatched orders per paid hour alongside late or damaged deliveries.